aboutsummaryrefslogtreecommitdiff
path: root/tools/testing/selftests/bpf/progs/test_autoload.c
diff options
context:
space:
mode:
authorVishal Verma <[email protected]>2023-10-26 11:32:41 -0600
committerDan Williams <[email protected]>2023-10-27 13:04:52 -0700
commit8f61d48c83f6e3525a770e44692604595693f787 (patch)
treebdc37ab403e92debf3a40cdd58173da0ac40f8e7 /tools/testing/selftests/bpf/progs/test_autoload.c
parent98a04c7aced2b43b3ac4befe216c4eecc7257d4b (diff)
tools/testing/cxl: Slow down the mock firmware transfer
The cxl-cli unit test for firmware update does operations like starting an asynchronous firmware update, making sure it is in progress, and attempting to cancel it. In some cases, such as with no or minimal dynamic debugging turned on, the firmware update completes too quickly, not allowing the test to have a chance to verify it was in progress. This caused a failure of the signature: expected fw_update_in_progress:true test/cxl-update-firmware.sh: failed at line 88 Fix this by adding a delay (~1.5 - 2 ms) to each firmware transfer request handled by the mocked interface. Reported-by: Dan Williams <[email protected]> Tested-by: Dan Williams <[email protected]> Signed-off-by: Vishal Verma <[email protected]> Link: https://lore.kernel.org/r/[email protected] Signed-off-by: Dan Williams <[email protected]>
Diffstat (limited to 'tools/testing/selftests/bpf/progs/test_autoload.c')
0 files changed, 0 insertions, 0 deletions