aboutsummaryrefslogtreecommitdiff
diff options
context:
space:
mode:
authorLuca Abeni <[email protected]>2015-10-16 10:06:21 +0200
committerIngo Molnar <[email protected]>2015-10-20 10:13:36 +0200
commit5aa5050787f449e7eaef2c5ec93c7b357aa7dcdc (patch)
tree415d7714d29be706d5713a6a2447500eba8d9c00
parent0baabb385eb4bce699ddab0db015112be6cf1e6a (diff)
sched/deadline: Fix migration of SCHED_DEADLINE tasks
Commit: 9d5142624256 ("sched/deadline: Reduce rq lock contention by eliminating locking of non-feasible target") broke select_task_rq_dl() and find_lock_later_rq(), because it introduced a comparison between the local task's deadline and dl.earliest_dl.curr of the remote queue. However, if the remote runqueue does not contain any SCHED_DEADLINE task its earliest_dl.curr is 0 (always smaller than the deadline of the local task) and the remote runqueue is not selected for pushing. As a result, if an application creates multiple SCHED_DEADLINE threads, they will never be pushed to runqueues that do not already contain SCHED_DEADLINE tasks. This patch fixes the issue by checking if dl.dl_nr_running == 0. Signed-off-by: Luca Abeni <[email protected]> Signed-off-by: Peter Zijlstra (Intel) <[email protected]> Cc: Juri Lelli <[email protected]> Cc: Linus Torvalds <[email protected]> Cc: Mike Galbraith <[email protected]> Cc: Peter Zijlstra <[email protected]> Cc: Thomas Gleixner <[email protected]> Cc: Wanpeng Li <[email protected]> Fixes: 9d5142624256 ("sched/deadline: Reduce rq lock contention by eliminating locking of non-feasible target") Link: http://lkml.kernel.org/r/[email protected] Signed-off-by: Ingo Molnar <[email protected]>
-rw-r--r--kernel/sched/deadline.c8
1 files changed, 5 insertions, 3 deletions
diff --git a/kernel/sched/deadline.c b/kernel/sched/deadline.c
index fc8f01083527..142df2668e5d 100644
--- a/kernel/sched/deadline.c
+++ b/kernel/sched/deadline.c
@@ -1066,8 +1066,9 @@ select_task_rq_dl(struct task_struct *p, int cpu, int sd_flag, int flags)
int target = find_later_rq(p);
if (target != -1 &&
- dl_time_before(p->dl.deadline,
- cpu_rq(target)->dl.earliest_dl.curr))
+ (dl_time_before(p->dl.deadline,
+ cpu_rq(target)->dl.earliest_dl.curr) ||
+ (cpu_rq(target)->dl.dl_nr_running == 0)))
cpu = target;
}
rcu_read_unlock();
@@ -1417,7 +1418,8 @@ static struct rq *find_lock_later_rq(struct task_struct *task, struct rq *rq)
later_rq = cpu_rq(cpu);
- if (!dl_time_before(task->dl.deadline,
+ if (later_rq->dl.dl_nr_running &&
+ !dl_time_before(task->dl.deadline,
later_rq->dl.earliest_dl.curr)) {
/*
* Target rq has tasks of equal or earlier deadline,